Port puts weight controls on Bridge of the Gods

On March 13, the Port of Cascade Locks placed traffic controls on the Bridge of the Gods due to requirements from the Federal Highway Administration and Oregon Department of Transportation.

Flaggers at each end of the bridge will control traffic weekeays, 8 a.m. to 3 p.m. Flaggers will alternate trucks up to 80,000 GVW over the bridge.

From 3 p.m. to 8 a.m., and during weekends, the bridge is controlled by temporary weight restriction signs limiting trucks planning to cross the bridge to 60,000 GVW.

Latest stories

Latest video:

Lawnmower torches Arbor Vitae on Portland Drive

The riding lawn mower driven by Norma Cannon overheated and made contact with dry arbor vitae owned by Lee and Norma Curtis, sending more than a dozen of the tightly-packed trees up in flames. The mower, visible at far right, was totaled. No one was injured; neighbors first kept the fire at bay with garden hoses and Westside and Hood River Fire Departments responded and doused the fire before it reached any structures. Westside Fire chief Jim Trammell, in blue shirt, directs firefighters. The video was taken by Capt. Dave Smith of Hood River Fire Department. Enlarge



Log in to comment